Record-setting Tunnel Under the Alps Reaches Interim Milestone

An excavator recently broke through a wall separating two sections of the $9.6-billion Brenner Base Tunnel, creating a 24.1 km continuous bore from the south portal at Fortezza to the Austrian border.
http://dlvr.it/SRB84q

Post a Comment

0 Comments

Comments